亚洲性色永久网址-亚洲性视频-亚洲性视频网站-亚洲性天堂-亚洲性网-亚洲性无码av中文字幕

Hello, welcome to visit Wuhu Yujie Metal Products Co. LTD!?

mobile

Check mobile websites

ChineseEnglish

TEL:

13855314297

News

There is much knowledge in fixing iron nails on wooden squares

Release time:2020-10-13     Time to browse

  Iron nails fixed on the wooden square has a lot of knowledge, let's study the stitching methods of iron nails fixed on the wooden square, what are the different places.

  I. Process principle of plastic formwork project

  The plastic formwork support system integrates the visual advantages of large steel formwork and the advantages of easy formwork and flexibility of wood formwork. The plastic template can be spliced by fixing iron nails on the wooden square directly. According to the size of concrete members, various models can be used in the vertical and horizontal arbitrary connection combination, convenient construction, through the use of special fixture lock, so that the concrete forming size more accurate. By using plastic formwork, the appearance quality of concrete can be more easily guaranteed, and the construction operation is more convenient than steel formwork, wood formwork and bamboo formwork.

  Second, low foaming multi-layer plastic building template production process and operation points

  The production process and operation points of low-foaming multi-layer plastic building formwork belong to the product patent, and have passed the scientific and technological achievements appraisal.

  Open mode:

  1. Control the time of mold removal. Premature removal of molds will lead to wall concrete sticking molds. When the concrete is completely set, the poured concrete will automatically detach from the formwork, making the demodulation process faster and easier.

  2. The removal of formwork must be ordered by the construction technical department. It is strictly prohibited to remove the formwork without permission.

  3. The removal of the bottom die shall comply with the provisions of gb50204-2002 Code for acceptance of construction quality of concrete structure engineering. The working team must apply for the removal of the bottom die before the removal is approved by the technical leader of the project department.

  4, formwork engineering operations should follow the supporting die and mold removal by an operation team, should follow the support to remove the lateral support, then the removal of vertical support and other principles.

  5. After the plastic template is removed, the working surface is clean, and there is no waste such as ash residue, and there is no need to brush the mold release agent on the contact surface with concrete.

  Iii. Materials and equipment

  Materials: low foaming multilayer plastic building formwork, channel steel, Angle steel, wooden square, nails, bolts, rebar, sponge bar.


  • Company

    Wuhu Yujie Metal Products Co. LTD
  • TEL

    +86 13855314297
  • Mmail

    anhuiyujie@outlook.com
  • Address

    Fangcun Industrial Park, Jinghu District, Wuhu City, Anhui Province

Mobile

主站蜘蛛池模板: 午夜视频久久 | 尤物视频在线观看 | 在线欧美一级毛片免费观看 | 久久久精品视频免费观看 | 久草热久| 视频一区二区三区在线观看 | 天天插天天干天天操 | 在线se| 国产在线91精品入口首页 | 四虎黄色网 | 国产精品毛片天天看片 | 久久综合伊人 | 中文字幕伊人久久网 | 欧美成人毛片一级在线 | 97视频在线观看视频在线精品 | 日本亚洲欧美 | 91视频免费入口 | 97在线视频免费公开观看 | 中国性猛交xxxxx免费看 | 日韩在线视频www色 日韩在线视频不卡 | 狠狠的色| 日本涩涩网站 | 国产精品麻豆一区二区 | 中文字幕123区 | 欧美一区二区三区精品 | 国产精品亚洲精品观看不卡 | 日韩欧美毛片免费看播放 | 2022国产男人亚洲欧美天堂 | 日本视频播放免费线上观看 | 欧美精品九九99久久在观看 | 欧美jlzz18性欧美 | 久操视频网| 色婷婷99综合久久久精品 | 国内精品自在自线在免费 | 久久精品久久久久 | 美女做羞羞 | 午夜国产精品色福利视频 | 国产成人+亚洲欧洲 | 中国国语毛片免费观看视频 | 久久2019| 色综合久久婷婷天天 |